Description:
Construction of full optical network: trenching, horizontal drilling, pipe laying, supply and installation of switchboards / points-of-presence (POPs), cable laying and blowing, optics installation and measurement, installation of electrical equipment and passive optical equipment, installation and assembly of optical network switchboards, shafts, building connections.
Works to be completed within GU Light project:
- Construction of optic internet network with excavation works
- Construction of optic internet house connections with excavation works
- Filling in and connecting of optic internet cables in the constructed networks and houses
- Measurement of the as-built route
- Preparation of as-built route documentation according to client requirements.
Project scope:
- In 2023, we will be working in eight localities in the Rhein-Nahe-Hunsrück region: Badenhard, Ohlenfels, Alterkulz, Volkenroth, Dörth, Leininger, Beltheim and Godenroth. Citrus Solutions GmbH will build an optic route of about 19 km and connect about 823 buildings to the network.
- In 2024-2025 we will continue with other localities in this and other regions.