Description:
Construction of an optical network from scratch: laying of pipes, construction of an optical cable network, laying and blowing of cables, optical assembly and measurement, control panel/access point (POP) delivery, installation, installation of power supply, electrical equipment and passive optical equipment, installation and assembly of optical network distribution cabinets, construction of building entrances.
- Total length of excavation trenches: more than 300 km
- The total length of the pipes – more than 700 km
- Building inputs − for 3686 buildings
- Optical cables – about 1830 km
- Cabinets – 232
- Central POPS – 4
End customer: BZV Angeln (Schleswig-Holstein, Germany, Angeln Association of Municipalities: Husby, Hürup, Freienwill, Steinbergkirche, Steiberg, Maasbüll and others, a total of about 30 municipalities)